Home
About
History
Vision & Mission
CMD Message
Products
Quality
Quality Process
Environmental Process
Certification
Resources
Assembly Procedure
Dimensioning
How to order
Plating Options
Infrastructure
Manufacturing Facilities
New Manufacturing Facilities
Testing Facilities
Sectors
Events
Contact
Contact Info
Survey No. 67/1A, Navage, Belagavi.
+91 831 2411380
admin@hydromatik.co.in
Assembly procedure with adaptor s for 24° / 37° coupilngs to ISO 8434-1
Home
Assembly procedure with adaptor s for 24° / 37° coupilngs to ISO 8434-1
Assembly procedure with adaptor s for 24° / 37° coupilngs to ISO 8434-1
Process 01
Process 02
Process 03
Process 03
Process 03
Process 03
Process 03
Process 03
Process 03
Process 03
Process 03
Lubricate thread and Cone / BO Nut ,BO-ZR,Sleeve and Pipe
Process 04
Slip nut & Flare Sleeve overthe tube end
Process 05
Ensure nut and Sleeve are facing the right direction
Process 06
Insert the adaptor into the coupling body &press the flared tube onto the adaptor
Process 07
Screw on Nut Manually until finger tight
Process 10
Assemble fitting until wrench - tight(without spanner extension)
Mark position of nut
Process 8
Mark the Nut & Tube to measure the prescribed turns
Process 9
Tighten the Nut around 1 1/4 and 1 1/2 round
(Note: Tube must not rotate)
Process 10
Assemble fitting until wrench - tight(without spanner extension)
Mark position of nut
Process 8
Mark the Nut & Tube to measure the prescribed turns
Process 11
Then tighten fitting firmly by 30°(1/2flat)
Recommended to use spanner extension for sizes over 20mm O.D (see chart)
Process 11
SPANNER LENGTH
Size
Spanner Length H (mm)
22-L
400
28-L 20-S
500
35-L 25-S
800
42-L 30-S
1000
38-S
1200